Open Country Dairy Milk Powder Plant

dairy

This project involved the construction of a second milk powder drying tower at the existing facility. Our company was engaged to carry out the initial topographical survey and supply of asbuilt information as required, establishment of survey control and construction setout grids, with structures checked for both position and height as required.

Tirimoana Place Subdivision

land-survey

Stage one of this project involved the creation of 10 new residential sections. Our company was involved in the initial concept design, the supply of CAD services in support of the project engineer, survey and preparation of asbuilt information through to the final land transfer surveying.

Ohakea Flight Simulator

heli-sim-outside

This is one of our favourite projects. It involves the annual calibration of the RNZAF’s helicopter simulator to ensure that the “virtual reality” experience operates within required parameters. This is achieved by measuring points, the position of which must be in the correct spatial relationship to the pilots eye position.

BP Station – Wanganui

bp

Our involvement started with the initial topographical survey and supply of asbuilt information sourced from various providers. Continuing work included the location of existing boundary marks, survey control and construction grid setout, and a check on the position of boxing prior to building construction.